Services · Bathrooms
A new bathroom, planned properly.
From a new shower to a full refit, we plan the work so you're not without a loo for longer than you need to be.
Stock photo
Stock photoSound familiar?
What people ring us about
- The bathroom's tired and you want it done once, properly.
- The shower's weak or the temperature jumps about.
- There's a slow leak under the bath or around the shower.
- You want a walk-in shower instead of a bath.
On the day
What happens
- We visit, measure and talk through what you want.
- You get a clear quote and a day-by-day plan.
- We strip out, do the pipework, and keep the water on overnight where we can.
- Tiling and fitting, then the finishing touches.
- We test everything, clean up, and show you round.
Questions
Bathrooms: common questions
How long does a bathroom refit take?
Typically one to two weeks ${S}, depending on the size and tiling.
Will I have a working toilet?
We plan it so you're without for as little time as possible, usually overnight at most.
Do you do the tiling?
Yes, or we can work with your tiler.
Can I choose my own suite?
Of course. We'll check it'll fit and work with your water pressure.
Want a straight quote?
Tell us what's going on, add a photo if you can, and we'll come back the same day Sample.